Drill 3 32 pilot holes at marked locations.
Mayline parallel bar installation instructions.
Parallel straightedge replacement parts can be found here.
Instructions to convert above board parallel rule to under board attachment when ordering components specific color and or size information may be required.
Left and right arrows move across top level links and expand close menus in sub levels.
Ball bearing rollers built into durable black phenolic plastic base.
This parallel bar moves seemlessly across the drawing surface has resulted in little to no smudging and in conjuction with a proper set.
Free shipping by amazon.
Get it as soon as wed sep 9.
Parallel with worksurface edge.
66 and 72 rectangular desk assembly instructions ard7230 ard6630 ard6030.
Mayline parallel straightedge options explained.
Attach cable ends with terminals to spring.
E z grip cap the e z grip cap is a handy 5 16 raised gripping bar that allows for easy maneuverability.
Be sure that the cable passes between cable clamp and l h.
Contact a mayline customer service representative.
The site navigation utilizes arrow enter escape and space bar key commands.
The drafting bar literally floats across the drawing surface and come with all mounting hardware.
Be sure cable passes between clamp and corner plate.
Remember to read all the instructions before beginning the installation or you may miss the opportunity to install the metal clips which stop your bar for moving side side or worse you could damage the bar.
Try to move the pulley from left to right.
1 16 of 101 results for mayline parallel bar price and other details may vary based on size and color.
Alvin paral liner 1101 48 mobile parallel straightedge 48 inches.
Place each pulley between your thumb and index finger.
Transparent blade for see through registration and fine line drawing quality.
Examine the pulley mounts.
Ball bearing rollers available in metal recommended for vellum bond and delrin for drafting film.
Align cable parallel with edge of board as shown in fig.
These products are also called mayline parallel straightedges parallel drafting bars parallel bars and parallel straightedges.
Align cable parallel with edge of board stedge stop cable 1b cable 1a 9.
Only 1 left in stock order soon.
Over time the screws become loose causing the wire to become slack.
The wire used to move the parallel bar up and down is mounted on a series of pulleys which are in turn mounted to the drafting board with screws.
Turn knob f onto stud.
Install cable clamp e onto stud of left corner plate c.
Up and down arrows will open main level menus and toggle through sub tier links.
Overview straightedge mobile parallel ruling w e z grip.